Rethink Concrete Roof Sequencing - Build Sooner with SlopeShield Plus SA

SlopeShield Diagram WebImage 01SlopeShield Plus SA gives contractors the flexibility they need with today's demanding schedules and labor-challenged market.

Benefits:

  • Apply as early as day-6 after a concrete pour or directly to damp concrete during reroofing
  • Prevents weather-related rewetting enabling early dry-in
  • Allows interior trades to safely begin BEFORE completing cure cycle
  • Eliminates curing calendar resets avoiding costly setbacks
  • Streamlines sequencing, protects the structure, keeps project moving
  • Saves time, labor, and expensive project setbacks

SlopeShield Icons Sidebyside 01

 

Green, Fresh Pour Structural Concrete

Install SlopeShield Plus SA over green concrete a minimum of 5 days after pour. Ensure the surface is dry to the touch and meets all the required preparation requirements published in the installation instructions.

Construct Pour Protect Roof Deck
Construction screenshot 1 Construction screenshot 2 Construction screenshot 3
Structural concrete roof preparation Minimum 5-day cure time, apply SlopeShield Plus SA on day 6 or thereafter Apply SlopeShield Plus SA to partially cured concrete, interior trades can begin

 

Lightweight Insulating Concrete

SlopeShield Plus SA can be applied to  lightweight insulating concrete. Substrate preparation includes priming the surface with sodium silicate approximately two days after the pour to lock in free lime and stabilize the surface chemistry.

Construct Pour/Prepare Protect Roof Deck
Construction screenshot 1 Construction screenshot 2 Construction screenshot 3

Lightweight concrete roof preparation

Minimum 5-day cure time, prime within two days, apply SlopeShield Plus SA on day 6 or thereafter

Apply SlopeShield Plus SA to partially cured concrete, interior trades can begin

 

Advantages of SlopeShield Plus SA Over Concrete

SlopeShield Plus Concrete Roof Building Open 080425

VS Evergreen HS 11

Applying SlopeShield Plus SA on day-6 of the cure process:

  • Allows interior trades to begin work safely and sooner
  • Eliminates curing calendar resets to avoid costly project delays
  • Prevents weather-related rewetting and enables early dry-in
Upon full cure, following American Concrete Institute (ACI) guidelines, SlopeShield Plus SA creates a walkable surface with excellent traction and supports construction equipment

 

Reroof: Over High Moisture Content Concrete

SlopeShield Plus SA can be applied over existing concrete with high moisture content if the surface is dry to the touch. Applying SlopeShield Plus SA eliminates rewetting—even after rain—reducing schedule uncertainty and maintaining interior operations.

Remove Protect Remain Operational

VS Moisture Laden Concrete

VS SlopeShield SA and Concrete VS SlopeShield SA Building

Damp concrete is exposed

Apply SlopeShield Plus SA to high moisture content concrete

Concurrent drying and protection maintains project momentum

 

Cure Times and Installation Guidance

SlopeShield Plus SA does not accelerate the natural curing process of concrete; proper curing is still essential for substrate integrity and performance. While SlopeShield Plus SA protects the concrete from external moisture and allows internal vapor to escape, VaproShield recommends following American Concrete Institute (ACI) guidelines for cure time. This guideline aligns with industry standards to ensure optimal results.

Continue the Conversation With Us
Take Our Webinar Icon Request a Roof sample Icon Start Your Mass Timber Protection Plan

 

Concrete Roof Deck Protection Resources

Related Products

 


August 26, 2024

Time Presentation Speaker Register

10:00am-10:50am EST

Apples to Oranges: The Impossibility of Comparing Advantages of Fluid-Applied Flashing Materials to their Alternatives

Guy Long
11:00am-11:50am EST Through-Wall and Transition Membranes: Selection and Installation Danielle Jackson
12:00pm-12:50pm EST What Is High-Temperature? Ben Meyer
1:00pm-1:50pm EST The Big Disconnect: Roof to Wall Connections for your Air Barrier Roy Schaffele
2:00pm-3:00pm EST Project Experiences With (or Without) Flashings Brian Stroik
Property Test Method 2022 Standard
(14 Tests)
Air Permeance ASTM E2178  
Apparent Core Density ASTM D1622   
Compressive Strength  ASTM D1621   
Dimensional Stability at 28 days ASTM D2126   
Fungi Resistance ASTM C1338   
Gap Bridging - Declare gap width and temperature tested ABAA 0004   
  Open Cell Content, Volume  ASTM D6226   
  Pull Adhesion  ABAA 0002   
  Surface Burning Characteristics  ASTM E84   
  Tensile Strength  ASTM D1623   
Thermal Resistance for a 25-mm thick specimen  ASTM C518   
Water Absorption by Volume  ASTM D2842   
Water Resistance with a 55-cm head of water  AATCC 127   
Water Vapor Transmission Rate for a 50-mm thick specimen - water and desiccant method ASTM E96  

pdf PDF Download (4.77 MB)

Conventional Reroof Practices

Convention Roof assembly Conventional Roofing tear off
A typical low slope roof consists of a roof covering, insulation layer, and structural deck leading to trapped moisture within the roof assembly. Conventional roofing practices call for the removal of the entire roof assembly which leads to disruptions for occupants and increased overall cost.

Reduce, Reuse, Renew

Reduce Capital Investment, Reuse Materials, Renew, and be Code Compliant

Reduce Reuse Renew 01 Reduce Reuse Renew 02 Reduce Reuse Renew 03 Reduce Reuse Renew 04
Tear off aged roof covering. Install SlopeShield Plus SA allowing damp substrates to dry. Work continues on reroofing with robust weather protection installed. Building remains occupied. Install new insulation layer and roof covering.

How SlopeShield Plus SA Dries Damp Substrates

SlopeShield Plus SA Drying Animation

Proving Substrate Drying: Case Study

The Solution Image 02a

SlopeShield Plus SA allowed the double plywood roof deck to dry out over a period of approx. 45 days. The closed cell foam acted as a vapor barrier, negating any downward drying. Only upward moisture movement through SlopeShield Plus SA could take place.

View Entire Case Study

The Results

Reducing Captial Investment

Challenge Solution Newark

Minimizing Occupant Disruption

Challenge Solution Condo

Challenge: Reroof, reduce labor and capital investment, keep the terminal functional.

Solution: SlopeShield Plus SA allowed:

  • the terminal to remain open without a single leak
  • reuse of remaining roofing layers, drying damp materials below
  • heavy foot traffic and machinery on the roof during final PVC roof installation

These benefits reduced overall project costs for owners and contractors.

Challenge: Reroof overburdened vegetative green roof without displacing condo residents on two stories.

Solution: SlopeShield Plus SA allowed:

  • residents to remain in their condos during the entire reroof
  • highly saturated plywood and insulation layers to be dried out, reused and diverted from the landfill

Owners saved valuable HOA monies for additional improvement projects.

Code Compliance and Energy Efficiency

IBC Logo IECC Logo Energy Efficiencyweb
Meeting/Exceeding Standards: VaproShield products are meticulously engineered to meet and exceed the standards set forth in IECC and IBC. Our high-quality air barrier and permeable vapor retarder membranes safeguard compliance with these codes, guaranteeing the highest quality and adherence to the regulations. Energy Efficiency: As a code compliant air barrier, SlopeShield Plus SA enhances energy efficiency in the roofing system by minimizing heat transfer and reducing reliance on the HVAC system, significantly contributing to energy savings for the life of the building.

Continue the Conversation with Us

SlopeShield Plus SA Resources Icon

 

We invite you to continue the conversation about self-drying technology with the VaproShield team

 

 